Saturday, January 19, 2013

Weekly Progress


It is nice to have a live-in helper. We got to leave Lola to her and checked on the new flat at 8am. This week's progress was less dramatic to the eyes than last week.

Master bedroom. Air Conditioning was all installed. More details were added in to the cabinets as well.
Some of the door frames were being put up.






Piper's room. They filled in part of the window space.


Lola's room. Air con was up.



Hallway. Storage room door was installed. Love my new door design.






Study Room. Surprisingly still hasn't seen any bookshelf yet. Perhaps they were being made in China.


Dinning room cabinet. You can see a bit of the laminate I picked. They looked exactly how I had imaged it. Good stuff.


Living room and Steve. Looking at his iphone as usual.


No comments:

Post a Comment